Center line to stage left wall- 40’-6" Center line to stage right wall (fly rail)- 37’-0" There is no additional offstage storage spaces
Stage Height
Deck to gridiron-67’-0" Actual flying height-64’-6"
Pin Rail
Located 37’-0" off deck, both stage right and stage left
Apron
14’-0" in depth with pit up, 8’-0" with pit down, elliptical in shape Stage height from house floor is 4’-0"
Floor
Stage floor is 1/4" tempered hardboard painted brown Underlayment is T&G pine, 3/4"ply, 2x4 nailer on concrete 3-1/2" from top of concrete Stage floor is not waxed Stage floor is not trapped
Load-in Facility
Loading door is located stage left (Marshall Street) Clear width and height is 9’-6" square Sidewalk is ramped from street level to loading door threshold Loading door is 0’- 8" above the stage. We have ramps to accommodate this situation. Trucks must park parallel to stage door on the street NO LOADING DOCK, NO FORKLIFT, NO TRUCK RAMP STEVENS CENTER CAN NOT GUARANTEE SPACE FOR TRUCK, BUSSES, ETC.
Counterweight System
43 single purchase linesets Operated from stage right on deck Arbor capacity 1,000 lbs. Pipe length- 52’-0" with 5’-0" extensions on both ends Pipe- 1-1/2"
Projection booth to plasterline-108’-0" Balcony rail to plasterline- 64’-0" Light booth to plasterline- 85’-0" Cove to plasterline- 85’-0" Bottom lights in box booms are 13’-0" above stage level Top lights in box booms are 21’-0" above stage level Upper box booms are 25' above stage level
Distance of Cable Runs from front of house positions to loading door